Distillery both plant spent wash generation is around 700 m³ per day which is feed to CSTR type Bio-digester having capacity 350 m³ each. After processing in digester generated methane gas 28800 nm³/day purity is 55-60% collect in gas holder then transfer through HDPE pipeline and feed to Sugar plant Boiler.
The press mud produced from the factory is lined on the yard for composting process and mixed by aerotriller machine using spent wash and microbial culture. Thus, after a period of 45 days, bio compost is prepared from the said press mud. The prepared bio compost was delivered to the farmers on the principle of no profit or loss to the member farmers.